Identified Smurf tubeIn this project we identified smurf tube in concrete metal deck. This project, if we used X-Ray, the customer would have paid for 70...
JPL (Area 9)At JPL we scanned Area 9 on the floor on the 2nd level, reinforcing bars and conduits 6" and 12” on center identified with GPR. Scanned...
175' Area & Concrete trenchScanned south of the project building at the top of the stairs. Approximately 175' area and concrete trench. Located various targets and...
JPLThis JPL job displays the high accuracy of our scanning for utilities with ground penetrating radar (GPR). Every one of these markings...
Northrop GrummanJust the other day, we completed a job at Northrop Grumman scanning 700+ feet. This job had a serious amount pipes located. Pipes...
Boeing ProjectThis complex Boeing project was a challenge that we were up for. We scanned with GPR 1000+ feet of asphalt. We marked the location of...